ANNUAL PERFORMANCE REPORT 2006-07
The
Karnataka Urban Water Supply and Drainage Board was constituted by an
Act of Legislature in 1974 and is functioning from August 1975.
The
Board is an implementing body for Water Supply and UGD facilities in
213 urban areas of the state except Bruhat Bangalore Mahanagara Palike.
The
Board aims to provide adequate water supply from assured and safe
sources of supply and also proper sanitation to all the urban areas.
There are 213 urban local bodies coming under the jurisdiction of Board,
under following category:
|
CATEGORY |
Nos. |
|
Corporations |
7 |
|
City
Municipal Councils |
44 |
|
Town
Municipal Councils |
94 |
|
Town
Panchayats |
68 |


|
Projects completed by the Board so far (from 1975)
|
Water Supply Schemes commissioned
:430
Under Ground
Drainage Schemes commissioned :42Nos.
Total cost for
implementation of WS & UGD
schemes
in Rs. Crores
:1548.34
Urban
Population covered under UGD
:
28%
Schemes commissioned
since inception upto March 2006.
Water
supply - 430 Nos
U.G.D
- 42 Nos
Total
estimate cost of these schemes
- Rs.1548.34 Crores
Population covered with drinking water
- 79%
Population covered with U.G.D facilities - 28%
The Board is executing
Water Supply and Under Ground Drainage Projects under the following
categories.
I PLAN SCHEMES:
A. WATER SUPPLY SCHEMES:
1. a) PIPED
WATER SUPPLY SCHEMES:
Piped water supply schemes are taken up for the towns having population
less than 20,000 as per 1991 census, for which the entire cost is borne
by the Government as Grant in aid.
b)
ACCELARATED URBAN WATER SUPPLY PROGRAMMES:
Under this programme also water supply works are takenup in towns having
population less than 20,000.
For these schemes 50% of the estimated cost is provided by the
Government or India as Grant and the remaining is borne by the State
Government.
2. URBAN WATER SUPPLY SCHEMES:
Under these schemes, drinking water supply is provided for cities/towns
having population above 20,000 as per 1991 census, with following
funding pattern of this scheme is as follows:
|
Sl. No. |
Category |
Funding Pattern |
|
|
|
Loan from financial Institution |
State Government Grant |
Local Body Contribution |
|
1 |
Population upto 20,000 |
NIL |
100% |
NIL |
|
2 |
Population above 20000 up to 75000 |
50% |
50% |
NIL |
|
3 |
Population above 75000 including City
Corporations |
66.67% |
23.33% |
10% |
B.
SEWARAGE SCHEMES:
1. UNDER
GROUND DRAINAGE SCHEME:
All
Urban areas irrespective of population comes under this Category with
following funding pattern. Under these schemes Priority is given to the
cities/towns having population of more than 1 lakh and situated on the
bank of rivers/seas. The funding pattern for UGD schemes is as follows:
|
Sl. No. |
Category |
Funding Pattern |
|
|
|
Loan from
financial Institution |
State
Government Loan |
Local Body
Contribution |
|
1 |
Corporations |
50% |
20% |
30% |
|
2 |
City Municipal
Councils |
50% |
25% |
25% |
|
3 |
Town Municipal
Councils |
50% |
30% |
20% |
II.MAINTENANCE
OF THE WATER SUPPLY SCHEMES:
As per the Government
Order the Board is maintaining the following water supply schemes.
Upto Consumer Point:
1. Kushalnagar 5. Ramanagaram
2.
Bethamangala 6. Channapatna
3.
Hubli-Dharwad city
7.
Belgaum
4. Mandya
city.
2. Upto
Bulk Supply
1. Karwar
2.
Bellary
3.
Gulbarga
As per the G.O.No. UDD 204 UMS 95 dated 15.11.96, the Board has to
hand over the completed schemes to the concerned Local Bodies, for
maintenance. As some of the Local Bodies have not taken-over the
schemes, the Board itself is forcibly maintaining the following water
supply schemes upto Bulk point.
1. Bhalki
6. Tumkur
2. Ilkal-Hungund
7. Gadag-Betageri
3. Bijapur
8. Mundargi
4. Arasikere
9. Hukkeri-Sankeshwar
5. Tiptur
III. Other
Schemes :
1.
Under National River conservation plan (N.R.C.P),
in 8 towns coming under the catchment areas of Cauvery and Krishna, (Thunga
Badra) rivers have been selected. It is proposed to prevent river
pollution by diverting and treating the sewage under core works, in
these town, for this, works costing Rs. 19.62 crores are approved by the
Government of India, works are under implementation and out of 8 STP's 6
STP's are completed and remaining are in progress.
2.
The Board is implementing Comprehensive Water Supply Scheme to
Karwar-Ankola towns with Gangavalli River as source at an estimated cost
of Rs. 30.00 crores under KUDCEM project with ADB assistance.
3.
The Board is taking up the augmentation of water supply scheme to
Hubli-Dharwad, Belgaum and Gulbarga at a total estimated cost of
Rs.180.00 crores under Karnataka Urban Water Sector Improvement Projects
(KUWASIP) financed by the World Bank.
4.
Board has takenup remodeling of existing distribution network,
Automation and Integrated Management System of Mysore city under
Jawaharalal Nehru National Urban Renewal Mission centrally sponsored
scheme at an estimating cost of Rs.194.54 Crores.
5.
Board has takenup Water Supply scheme in 4 (Birur, Siddapura, Hirekerur
& Davanagere) towns and underground drainage scheme in 6 towns (Pandavapura,
S.R.Patna, Nanjangud, Malavalli, Channapatna & Davangere) under UIDSSMT
a centrally sponsored programme at an estimated cost of Rs.83.13 crores.
IV.
Performance During 2006-07
During the year 2006-07 out of 58 Schemes the Board proposed commission
20 water supply schemes and 4 Sewerage Schemes. The details of the
achievements are as follows:
|
Sl.
No. |
Scheme |
Annual Target |
Achievement (Schemes
commissioned) |
Estimated Cost (Rs.in
crores) |
|
1 |
Piped Water
Supply Schemes |
1 |
1 |
1.89 |
|
2 |
Accelerated Urban
Water Supply Programme |
11 |
4 |
27.16 |
|
3 |
Urban Water
Supply Schemes |
8 |
2 |
7.10 |
|
4. |
Under Ground
Drainage Scheme |
4 |
1 |
15.00 |
|
|
Total |
24 |
8 |
51.15 |
Mobilisation of Resources during 2006-07
The Board
budget for 2006-07 for implementation 135 schemes is prepared for
Rs.354.09 crores. The resources mobilization are as follows.
Rs. in Crores
Receipts
1. Government
Grant
88.22
95.18
2. Government
Loan
80.00
8.00
3. Local body
share (SFC)
60.00
60.00
4. IEBR
50.00
--
5. Opening
Balance
63.38
63.38
6. RDPR Share
4.47
6.96
7. ULB Share
8.01
8.00
Total
354.08
241.52
Expenditure (2006-07)
Rs. in Crores
1. Water Supply Schemes
119.50
2.
Sewerage schemes 15.98
TOTAL
135.51
The Government
has accorded administrative approval for 36 schemes during 2006-07
the details are as follows:
Rs. in
Crores
|
Sl. No. |
Schemes |
Nos |
Estimated cost |
|
1 |
Piped Water Supply |
11 |
24.14 |
|
2 |
Accelerated Urban Water Supply Programme |
2 |
15.24 |
|
3 |
Urban water supply schemes |
14 |
176.71 |
|
4 |
Under Ground Drainage |
9 |
137.12 |
|
|
TOTAL |
36 |
353.22 |
Activities of the Board for the year 2007-08
There are 60 schemes in the Board at the beginning of the year 2007-08,
which includes 42 water supply & 18 under ground drainage schemes, apart
from the schemes which were commissioned in the earlier year to be finalised during the current year.
During the current year 2007-08. It is proposed for commissioning of 31
schemes the scheme wise details are as follows
|
Sl. No. |
Scheme |
Nos of schemes |
AnnualTarget
|
Estimated Cost |
Budget allocation
2007-08 |
|
1 |
Piped Water
supply |
11 |
05 |
24.15 |
12.60 |
|
2 |
Accelerated Urban
water supply programme |
07 |
07 |
81.40 |
30.71 |
|
3 |
Urban Water
Supply Schemes |
24 |
14 |
424.60 |
148.39 |
|
4 |
Under ground
drainage schemes |
18 |
05 |
229.14 |
77.66 |
|
|
TOTAL |
60 |
31 |
759.28 |
269.36 |
The total Board budget for the year
2007-08 is Rs.334.11 crores. The details are as follows:
Rs.
in crores
1.
Government Grant
115.87
4.98
2.
Government Loan
44.00
3.
Local body share (SFC)
- -
4.
IEBR
50.00
5.
Opening Balance
104.74
6.
RDPR Share
19.68
7.
ULB Share
- -
TOTAL
334.11
The Board has prepared an action plan for 2007-08. Which
includes 26 new proposals and ongoing schemes.
Schemes
targetted for commissioning during 2007-08
|
Sl.
No. |
Name
of the Scheme |
Estimated Cost |
Budget allocation for 2007-08 |
Target Date of Commissioning
|
|
1 |
2 |
3 |
4 |
5 |
|
I |
Piped Water Supply Scheme |
|
|
|
|
1 |
Tarikere |
43.00 |
26.00 |
Oct-07 |
|
2 |
Hukkeri |
86.00 |
45.00 |
Nov-07 |
|
3 |
Hadagalli |
103.30 |
51.00 |
Dec-07 |
|
4 |
Thirthalli |
202.00 |
146.00 |
Jan-08 |
|
5 |
Molkalmur |
160.00 |
80.00 |
Jan-08 |
|
|
Total |
594.30 |
| |